Ticket flow

One ticket, one owner, from the report to Done. This page animates the path an engineer walks with a ticket. The stations are the stages of the technical ticket workflow; the steps are what the owner does at each one, and what goes on the ticket.

Follow one ticket from the report to Done. Choose a path. The card is the ticket; the panel beside the map shows what the owner adds to it at each step.

Team channelalerts go hereReportedA signal, not a specResearchInvestigate, time-boxedTicket updatedBuilder and blast radiusEstimatedHours, tests and PR includedReadyDefinition of ReadyIn sprintMonday planningIn progressOne ticket at a timePR and reviewOne sub-ticket per PRQAEngineeringUATProduct and DesignDoneDefinition of Done
Step 1 of 14

A bug is reported. A report is a signal, not a spec. The reporter is not responsible for the solution.

  • Active
  • Reporter
  • Owner
  • Admin
  • Product
  • Design

Bug

A bug report is a signal, not a spec. The reporter is not responsible for the solution. The owner is, from the first look until Done.

Investigate, define the blast radius, update the ticket, estimate, Ready. Blast radius is everything that changes behavior if you change this code: hooks, documents, schemas, canvas elements, existing data, the framework.

A bug that is contained, touches one component, needs no data change and can be fixed and tested in a couple of hours takes the fast path instead.

How a ticket moves​

  1. Every ticket has exactly one owner. Other people contribute, review or deliver dependencies. The owner is accountable for the ticket reaching Done.
  2. The ticket is the record. If it is not in the ticket, it did not happen. Slack is for alerts and questions. Jira is for findings, decisions, estimates and status.
  3. Update your tickets every morning before standup. Standup screen-shares Jira. A stale ticket is a stale status.
  4. A ticket enters a sprint only when it is Ready. Ready is checked in the weekly refinement and confirmed in Monday sprint planning. Prepare at least 30 minutes before planning: your tickets are estimated and your sub-tickets exist.
  5. Work on one ticket at a time. Finish it before starting the next.
  6. Done means the Definition of Done, not "PR merged".

The ticket moves forward only through the owner. It moves backward whenever new evidence invalidates what the ticket says. Moving backward is normal. Hiding new scope inside "In progress" is not.

Who does what​

RoleOwns
ReporterThe signal: a bug, a story, a customer request. Not the solution.
OwnerInvestigation, research, blast radius, ticket update, sub-tickets, estimate, implementation, PR, QA fixes, documentation.
AdminConfirms framework changes, approves splits with high blast radius, resolves separation-of-concerns calls.
ProductDefines the story outcome, runs refinement, runs UAT with Design, owns the go-live decision.
DesignUser journeys, high-fidelity designs on Sketch Cloud, UAT with Product.

Bug​

Assume the bug was reported. A report is a signal, not a spec.

  1. Investigate. Reproduce it and write the steps to replicate as you go. Find the owning hook, document, schema or canvas action. Separate the symptom from the cause. Stuck for more than 1h? Ask for help.
  2. Define the blast radius. Every hook, document, schema and canvas element that uses the code you will change. Existing data means a migration. Framework means admin confirms first. Classify it contained or high.
  3. Update the ticket. Reproduce, root cause, fix, blast radius, out of scope, verify cases. Root cause and blast radius are never empty.
  4. Estimate in hours. Include tests, PR, the review round and QA fixes. The estimate becomes a commitment at sprint planning.
  5. Ready. Steps, root cause, blast radius, estimate and verify cases are on the ticket. Framework changes are confirmed with admin.

A bug that is contained, touches one component, needs no data change and can be fixed and tested in a couple of hours takes the fast path: fix it, open the PR, and still write the root cause in one line on the ticket.

Story​

  1. Research. Read the story, the design and the Sketch Cloud flow. Walk the user journey in the app and the drag-and-drop flow in the builder. Draw the journey in Figma if it is not drawn. Find what exists to reuse. Define the lifecycle, the data sizes, the edge cases and what is out of scope.
  2. Update the ticket's Builder section.
    • Schemas: new or changed, with fields, types and status fields.
    • Documents: new or changed, named as they appear in the builder.
    • Existing hooks: one short sentence each on what changes.
    • New hooks: name and one paragraph: trigger, input, output, side effects.
    • Builder canvas updates: pages, forms, tables, actions, place in the UI, option names, statuses.
  3. Create sub-tickets. One per hook. One with the documents and schema changes. One with the canvas updates. Each has its own estimate and verify list and links the parent. Order: schemas and documents, hooks, canvas.
  4. Estimate. Every sub-ticket in hours; the story is the sum plus an integration pass. If it does not fit one sprint, propose a split.
  5. Ready. The Definition of Ready, plus: Builder section filled, sub-tickets ordered and estimated, out of scope written, blast radius classified, framework changes confirmed.

Research rules​

  • Stuck for more than 1h, ask for help. Post what you tried and what you expected.
  • Blast radius too big, propose splitting the story. Each new story delivers something a user can see.
  • The story touches separation of concerns (framework, infrastructure, application, builder): break it apart, one ticket per layer.
  • Bugs found while researching are logged as bugs. Log it, link it, move on.
  • Look for ways to unify into larger framework tasks. Two stories that need the same thing are one framework task plus two smaller stories.
  • Framework changes MUST be confirmed with admin. Before estimating, not after coding.
  • Do not assume what the reporter meant. Ask one specific question and write the answer in the ticket.
  • Treat the first answer as a hypothesis, from a colleague, the docs or AI. Verify it in the code before it goes in the ticket.

Alerts​

Alerts inform the team of a finding even when you are not sure of the outcome. Post immediately on the channel, then keep working on what the alert does not block. An alert is a heads-up, not a stop.

**Alert:** <type>
**Ticket:** <key>
**Found:** <what you found, two sentences>
**Why it matters:** <who or what is affected>
**Proposal:** <what you suggest>
**Confidence:** low | medium | high
AlertPost it when
High blast radiusMore than 3 existing hooks change, over 30% of an existing hook changes, a schema with customer data changes, a migration is needed, or the framework changes.
StuckMore than 1h on a research question with no progress, or a blocking dependency with no owner.
ScopeThe story cannot be estimated inside one sprint, or research shows it is really two or more stories, or two stories share a framework need.
Bug found on the wayAny bug found while researching or implementing a story.
SlippingThe moment you know a sprint commitment will not hold.
FrameworkAny proposed change to the framework, before estimating.
AlignmentA ticket that does not serve the current objectives.
  • Technical ticket workflow describes each stage in detail: report, triage, detail, research, plan, phase, execute, submit, test, accept, release.
  • Ready and done holds the quality gates.
  • Meetings covers standup, planning and the technical plan meeting.